Skip to content Skip to sidebar Skip to footer

Tag: inspection

Neelum Jhelum achieves max capacity of 969 MW after TRT inspection

” Neelum Jhelum achieves max capacity of 969 MW after TRT inspection ” | Current Pulse | Pakistan

" Neelum Jhelum Hydroelectric Project has achieved its maximum generation capacity of 969 MW yesterday. Following resumption of its operation early this month after inspection of the tail race tunnel (TRT), the project is continuously in operation as per the availability of water and contributing electricity to the National Grid, especially during Sehr and Iftar…

Read More

Go to Top